References

Latest projects

Some of our latest chosen references.

  • Rescue vessel RS 178 Gjert Wilhelmsen II at speed off the coast

    RS 178 – Gjert Wilhelmsen II

    Client

    GOT Marine / Redningsselskapet

    Vessel

    RS 178 Gjert Wilhelmsen II

    Location

    Mandal, Norway

    Year

    2026

    Scope

    Complete interior

    HMI produced, supplied and installed the complete interior for RS 178 Gjert Wilhelmsen II, built by GOT Marine in Mandal for Redningsselskapet.

    The 32-metre hybrid SAR vessel is the largest and most advanced rescue vessel in Redningsselskapet’s history. HMI’s scope covered the complete interior delivery from production through onboard installation and final completion.

  • Ferry Color Line Hybrid sailing between islands along the coast

    Color Line Hybrid – Dry Dock 2026

    Client

    Color Line

    Vessel

    Color Hybrid

    Location

    Frederikshavn, Denmark

    Year

    2026

    During the 2026 dry dock of Color Hybrid, HMI completed a broad interior refurbishment covering both technical/service areas and selected public spaces.

    The flooring scope included the complete removal and replacement of existing resin flooring in galleys, sculleries and storage rooms using SikaFloor Marine systems. HMI also installed new vinyl flooring in selected gangways and corridors, together with new floor and wall tiles in three public toilets.

    In addition, HMI delivered a new seating area on Deck 6 with new seating and artificial stone tables, as well as a number of smaller upgrades and modifications in the onboard shops.

    The project was carried out as part of the vessel’s planned dry dock, with HMI coordinating multiple interior disciplines within a tight execution window.

  • Large high-speed ferry with Color Line lettering on the open sea

    Color Line Superspeed 1 – Dry Dock 2026

    Client

    Color Line

    Vessel

    Superspeed 1

    Location

    Frederikshavn, Denmark

    Year

    2026

    While HMI had a team of 12–15 technicians working onboard Color Hybrid, Superspeed 1 was docked alongside, allowing us to carry out several additional interior upgrades in parallel.

    The scope included new flooring in all elevators, new deck covering and tiles in selected public bathrooms, new vinyl flooring in one of the clothing shops, and the installation of new B15 doors in the accommodation areas.

    HMI also completed a number of smaller repairs and upgrades throughout the vessel, helping maintain the interior standard and condition of the ship during the planned docking period.

    Multiple interior upgrades were completed within the available docking window, allowing Superspeed 1 to return to service with renewed public, retail and accommodation areas without extending the planned yard stay.

  • Viking Venus – Dry Dock Singapore 2026

    Client

    Viking Ocean Cruises / Wilhelmsen Ship Management

    Vessel

    Viking Venus

    Location

    Bangkok / Singapore

    Year

    2026

    HMI’s team of technicians boarded Viking Venus in Bangkok and sailed with the vessel to Singapore ahead of the scheduled dry dock, allowing preparations and onboard work to begin before arrival at the yard.

    The main scope included a completely new sports area on Deck 9, featuring artificial turf, mini golf and a boccia court. HMI also carried out a complete renewal of the deck covering in all 14 suites, from the steel deck up, finished with high-end tiles, together with the upgrade of two saunas in the spa area.

    The project combined riding-team execution with planned dry-dock work, allowing several interior areas to be completed efficiently within the vessel’s operational and docking schedule.

  • Subsea construction vessel Normand Navigator at sea, with its crane on the aft deck

    Normand Navigator – Refit 2026

    Client

    Solstad Offshore

    Vessel

    Normand Navigator

    Location

    GMC Yard, Stavanger, Norway

    Year

    2026

    After several years of operation in Brazil, Normand Navigator returned to Norway ahead of a new subsea contract. HMI was contracted to renovate and upgrade the vessel’s ROV control room as part of the preparation work.

    HMI also carried out a complete reconfiguration of two cabins. Two existing prefabricated wet units were removed, and the available space was redesigned and rebuilt into a modern client office area. The project combined refurbishment and structural interior reconfiguration, adapting existing accommodation spaces to meet new operational requirements before the vessel returned to service.

  • Refitted passenger lounge with cream seats and a slatted wooden screen

    MACNA – Passenger Catamaran Refit of two vessels

    Client

    MACNA

    Location

    Suez, Egypt

    Year

    2026

    Scope

    Complete Refit & Conversion

    HMI carried out the refit and conversion of two luxury passenger catamarans back to full-capacity operation, with capacities of 204 and 326 passengers.

    The project was executed within an ambitious timeline at a shipyard in Suez, Egypt. HMI managed the complete scope from engineering and manufacturing to subcontractor coordination, production of passenger seating, logistics and final installation onboard.

    Both vessels were completed in just 12 working days through close coordination between HMI, the client and the local shipyard.

  • Orange accommodation vessel Edda Fides under way at sea

    Edda Fides – Dry Dock 2026

    Client

    Østensjø Rederi

    Vessel

    MV Edda Fides

    Location

    Gibraltar

    Year

    2026

    Scope

    Bathroom Deck Renewal, Smoking Room Rebuild, Corridor Flooring & Galley Epoxy Upgrade

    During the 2026 dry dock of MV Edda Fides in Gibraltar, HMI carried out a substantial interior refurbishment across accommodation, public and service areas.

    The scope included complete renewal of the flooring in more than 40 client-cabin bathrooms from the steel deck up, using Dexcoat Energy, together with several hundred square metres of new vinyl flooring in corridors.

    HMI also completed a full renovation of the smoking room, including new bulkheads, ceiling, furniture and flooring.

    In the galley, preparation areas, scullery, coolers and freezers, HMI applied a new marine-approved epoxy topcoat, upgrading heavily used service areas as part of the vessel’s planned dry-dock programme.

  • Jack-up rig Crossway Eagle standing on its legs at sea

    Crossway Eagle – Cabin Conversion 2025

    Client

    Macro Offshore Management

    Vessel

    Jack-up Rig Crossway Eagle

    Location

    GOT, Mandal, Norway

    Year

    2025

    Scope

    Major Cabin Modification – 156 Single Cabins Converted to Double Cabins

    HMI was awarded a significant contract by Macro Offshore Management for a major modification of the accommodation onboard Crossway Eagle, converting 156 single-occupancy cabins into double cabins during the rig’s planned yard stay in Mandal.

    HMI took responsibility from the preliminary design and engineering stage through production and final onboard installation.

    The scope included the production and installation of 156 upper bunk beds, 156 additional wardrobes, privacy curtains and reading lights, together with the necessary modifications and adjustments required to prepare each cabin for double occupancy.

    With a substantial scope and a tight execution window, the project required detailed planning, efficient production and close coordination between HMI, Macro Offshore Management and the yard. The complete project was delivered on time and within the agreed budget, demonstrating HMI’s ability to execute large-scale accommodation modifications within demanding offshore schedules.