During the 2026 dry dock of Color Hybrid, HMI completed a broad interior refurbishment covering both technical/service areas and selected public spaces.
The flooring scope included the complete removal and replacement of existing resin flooring in galleys, sculleries and storage rooms using SikaFloor Marine systems. HMI also installed new vinyl flooring in selected gangways and corridors, together with new floor and wall tiles in three public toilets.
In addition, HMI delivered a new seating area on Deck 6 with new seating and artificial stone tables, as well as a number of smaller upgrades and modifications in the onboard shops.
The project was carried out as part of the vessel’s planned dry dock, with HMI coordinating multiple interior disciplines within a tight execution window.